![]() |
|
Penarth Dock, South Wales - the heritage & legacy . . . |
|
Volume Six - Pre-Victorian to the Present Day - Select Aspects - Structural Analysis of the river Ely Subway by Rota Design Limited - 2015 |
|
|
|
A cross-sectional drawing of the subway showing its relation to the river bed and the high water level at MHWS - mean high water spring tide. This drawing was prepared by Rota Design Limited as a preparatory reference document for finite element analysis of the subway under load. [108] |