|
Volume Six - Pre-Victorian to the Present Day - Select Aspects - Structural Analysis of the river Ely Subway by Rota Design Limited - 2015 Stress - principal stress We found that the maximum stress in tension was 4.0 MPa and the maximum compressive stress 10.0 MPa. Buckling Analysis Another question we have to answer when we undertake analysis on a structure such as a tank, chamber or pipeline that is buried underground would be does it buckle under load? This analysis is undertaken using the same software but we would always have a manual calculation to check that we haven't added an extra zero or so into the software inputs (so easy to to do!). The main problem with all computer programs is if you put incorrect data in you get the wrong answer out. In this case it could have implications for the safety of people walking through the subway. The minimum requirement is that the buckling factor should be greater than unity (1); in the case of our subway it was found to be greater than 10 (non-linear buckling factor). Conclusions and Comment The subway has survived the years of service by being rather over-engineered. The buckling factor is excessive by modern standards and thus would be deemed a waste of materials in today's engineering design office. The maximum deformation at approx. 7 mm is minimal and the stress levels are not of great concern. So our initial studies have not revealed any results which would suggest that the subway is liable to fail in the near future. |
|||
| Introduction | |||
| Contents | |||
| Search this site | |||
| Contributions | |||
| Links | |||
| Recent Updates | |||
|
|||
| | volume 06 | chapter 17 | page 060 | << previous page << | index to volume six | >> next page >> | | |||