|
Volume Six - Pre-Victorian to the Present Day - Select Aspects - Reconstruction of Three Tips - 1912 - 17 . . . Construction Progress : A Photograph Album - A search of the archives of the National Museum of Wales (Amgueddfa Cymru) during Spring 2018 revealed an album of photographs showing No. 5 tip (Tannett Walker Ltd.) and No. 4 tip (East Ferry Road Engineering Co. Ltd.) in various stages of construction at Penarth Dock. The two other tips concerned with the contract for No. 4 tip, i.e. Nos. 11 and 12 tips, were not completed until 1916 and 1917 respectively due to the Seamen's strike coupled with raw material and labour shortages due to the onset of WWI. Many thanks to the Curator for Industry & Transport at the National Museum of Wales, Mr. Mark Etheridge, and all the staff at Nantgarw for their patience and assistance in helping me to add these heritage images for all to see and appreciate. There does not appear to be a record of who took these photographs but I suspect that it was an official of, or on behalf of, the TVR. The photographs have been cropped since the album is actually a notebook with the corners of each photograph inserted within diagonal cuts in the paper. I have adjusted these faded photographs in an attempt to enhance the technical detail where possible. Whilst only Part 2 is relevant to this chapter I have included Part 1 since it forms an integral part of the album.
|
|||||||||
| Introduction | |||||||||
| Contents | |||||||||
| Search this site | |||||||||
| Contributions | |||||||||
| Links | |||||||||
| Recent Updates | |||||||||
|
|||||||||
| | volume 06 | chapter 14 | page 160 | << previous page << | index to volume six | >> next page >> | | |||||||||